Golden State Water Company enhanced its Edna Road System by installing an ion exchange system for selenium removal and a MetalGuard™ Selenium online analyzer to ensure compliance with heavy metal regulations. By continuously monitoring selenium levels in real time, operators can make immediate, data-driven adjustments to the treatment process, ensuring compliance with regulatory standards and maintaining high water quality. The integration of real-time monitoring has significantly improved operational efficiency, reduced waste disposal costs, and increased the flexibility of treatment methods.
Golden State Water’s Proactive Approach to Heavy Metal Compliance
